Products Description
Turned connection parts are require high concentricity (≤0.005mm). The outer thread and inner bore share the same rotational axis. Need precision thread control, must burr-free sealing faces. At XC Precision we turned parts excel at creating perfectly cylindrical geometries - threads, stepped diameters, sealing faces, and internal bores - all in one continuous machining operation. The turned connection parts we made are engineered for one purpose: seamless, repeatable assembly
------------------------Our Turning Technical Specifications----------------------
|
Parameter |
Capability |
|
Turning Diameter |
Up to Ø500mm |
|
Secondary Operations |
Milling, Cross-Drilling, Knurling |
|
Materials |
Aluminum, SS303/304/316, Brass, Titanium |
|
Tolerance |
±0.005mm |
|
Thread Types |
Metric, UNF, NPT, Custom |
|
Surface Roughness |
Ra 0.4 – 1.6μm |
|
Surface Treatment |
Plating, Anodizing, Passivation… |

--------------------- Our Full Manufacturing Capability-------------------------
From plastic to metal,From prototype to production
With milling, turning, silicone mold, sheet metal fabrication, 3D printing and rapid tooling
|
Technology Available |
Laser Cutting, Bending, Punching, Riveting for Sheet Metal Fabrication CNC Milling, CNC Turning for Machining works SLA, SLS, SLM for Rapid Prototypes Vacuum Casting and Rapid Tooling for Low volume production |
|
Materials Available |
Metal or Plastic, Block or Bar Like Steel, Stainless steel, Brass, Copper, Bronze, Aluminum, Titanium… ABS, PC, PP, PA, PEEK, POM, PMMA, PE, PA+GF, PVC, PET, PBT… |
|
Size |
Flexible on customers' design (Up to 3 meters, Thin to 0.05mm) |
|
Surface Treatment |
Spray Painting, Powder Coating, Plating, Passivation, Anodized, Brushing, Polishing, Laser Engraving, Silk Screen… |
|
Quality Control |
ISO9001 certified With standard quality process and various inspection equipment and professional QC Team 100% inspection before shipping |
|
Lead Time |
Production Time: Prototype Sample: Within 7 Days Low volume production orders: 2-3 Weeks Shipping Time: 3-7 Days via DHL, UPS, FedEx 2 to 3 Weeks by Air Freight 4 to 6 Weeks or by Sea Freight |

Hot Tags: turned connection part, China turned connection part manufacturers, suppliers, factory







